Latest News

Muirhead Subdivision

on April 19, 2013

Muirhead Subdivision

In both June 2012 and April 2013, Ecosol was engaged by BMD Constructions Pty Ltd to supply a total of five (5) Ecosol Net Guards for Stages 2 and 3 of a large Defence Housing Subdivision in Muirhead, Northern Territory.

In consultation with the design engineers, the Ecosol Net Guard was recommended as a suitable solution for primary treatment.  Based on feedback and Council’s requirements, a treatment system that is isolated below surface, does not hold water, easily maintained, and effective at capturing and retaining various gross pollutants, as well as sedimentation, was required. The Ecosol Net Guard became the obvious choice.

Each Net Guard was designed and manufactured to suit the site specifications, including type, size and depth of pipe/culvert, and sized to suit the hydraulic requirements for each pipeline.

Ecosol attended the delivery of the units to ensure they arrived safely, on time, within specification and quality.

Share this post:
CoderMuirhead Subdivision